Pages

Wednesday, November 17, 2021

Project Shifting

Currently, two quilts are under construction in the quilting room. Both have been mentioned here in recent previous posts, and the fun of it is, I can pick one up depending on what seems most interesting or most doable in the time I have to stitch.

Yesterday is a prime example of working on both. First, I made a few more Temecula Basket blocks and more setting blocks. I need to do some figuring to determine how big I want this to be; surely I am getting close to having a good-sized quilt.

When I was at a good stopping point on Temecula Baskets, I turned to Lunch Box Social. It was supposed to be further along than this after a full day of sewing on Friday with the Frienzies. 

Ahem. 

I did not do nearly as much sewing as I did visiting. 

Truly, those Thangles triangles are the only bits I finished on Friday. I hadn't even unpacked my bags as of yesterday. I was dreading the cutting of all those HSTs. So I faced the music yesterday and got 'em all done.


Perfect 2" HSTs all cut and pressed and ready for the next step in Lunch Box Social. Before I need those, however, I finished a step involving the 9-patches. They needed to be surrounded by this muted stripe. Easy-peasy.

Since this is a smallish quilt - throw or table cloth - I only need to make 9 blocks that are very involved. Then the top construction can begin. This should be coming together quite fast. Makes me wonder why I kept putting off making it - I think I can go back to a goals list for 2017 and see this listed there. *geesh*

Hope you are having the best Wednesday! DH and I are going on an afternoon day date - thrift store shopping and maybe more!

Happy Quilting, Friends!







No comments:

Post a Comment

Feedback on my posts is always welcome!